Throughout the process the factory has shown great performance, good organization and willingness to help in line with the demands of the project and has produced furniture of high quality.The enthusiasm and assistance of the factory were greatly appreciated by our team
Tongda brought our boutique hotel’s design vision to life with bespoke furniture that adds elegance and personality. The quality and craftsmanship are top-tier. The team’s service and attention to detail were exceptional throughout the project.
Yes, we specialize in customized luxury hotel furniture. We can bespoke furniture according to your drawings, design concepts, or specifications, with flexible options for materials, sizes, colors, and finishes.
Normally, it takes 60 days after drawings confirmation to ship. Sample production usually requires 15–30 days. For urgent projects, please inform us in advance so we can coordinate production schedules.
Replacing hotel furniture during renovation is more complicated than ordering new pieces. Existing dimensions, finishes, materials, upholstery and room conditions all affect the result. This guide explains what should be matched, when an old piece should be reproduced or redesigned, and how samples and production control help keep renovated rooms consistent.
In 2016, Tongda supplied a custom furniture package for the Radisson Lackawanna Station Hotel Scranton in Pennsylvania, USA.The project was part of a wider guest room renovation programme at a hotel with an unusual history. The property occupies the former Delaware, Lackawanna & Western Railroad Station, a historic building completed in 1908 and later converted into a hotel.
When a hotel furniture budget is higher than expected, the first reaction is often the same:“Where can we reduce the cost?”That is a reasonable question.But in hotel projects, not every cost reduction is a good one.Changing a decorative detail may save money without affecting the furniture's performance.
When a hotel furniture supplier says production will take 60 days, it is tempting to put 60 days into the project schedule and move on.We would not recommend doing that.Hotel furniture lead time does not start when furniture enters the workshop.
A Multi-Phase Loose Furniture Programme for a Luxury Beach Resort in ThailandDusit Thani Krabi Beach Resort is a luxury beachfront resort on Klong Muang Beach in Krabi, Thailand. The resort currently has 240 guest rooms and suites, together with beachfront pools, restaurants, bars and Devarana Spa.
Good veneer matching is not simply about choosing wood with a similar colour. For luxury hotel furniture, grain direction, colour variation, panel layout, symmetry and finishing all affect the final result. This article explains what experienced furniture manufacturers look for when matching natural wood veneer.
Hotel renovation furniture is not simply a smaller version of a new-build project. Existing rooms, phased construction, changing designs and tighter delivery windows all affect how furniture should be developed and produced. Based on Tongda's project experience, this article explains what makes refurbishment projects different.
For a luxury hotel project, choosing a furniture supplier is not simply about finding a manufacturer with attractive products or competitive pricing.Custom hotel furniture often starts with a drawing, rendering, material specification or design concept.
Wood veneer is widely used in hotel furniture for its natural appearance, material flexibility and ability to create a refined surface finish. But when veneer is carefully cut and arranged into a geometric pattern, it becomes more than a surface material.It becomes part of the furniture design.
Custom Guestroom Furniture Manufacturing for an International Hotel Opening in Melbourne, AustraliaTongda Hospitality delivered customised guestroom furniture solutions for the Mercure Melbourne Doncaster hotel project in Melbourne, Victoria, Australia.