Throughout the process the factory has shown great performance, good organization and willingness to help in line with the demands of the project and has produced furniture of high quality.The enthusiasm and assistance of the factory were greatly appreciated by our team
Tongda brought our boutique hotel’s design vision to life with bespoke furniture that adds elegance and personality. The quality and craftsmanship are top-tier. The team’s service and attention to detail were exceptional throughout the project.
Yes, we specialize in customized luxury hotel furniture. We can bespoke furniture according to your drawings, design concepts, or specifications, with flexible options for materials, sizes, colors, and finishes.
Normally, it takes 60 days after drawings confirmation to ship. Sample production usually requires 15–30 days. For urgent projects, please inform us in advance so we can coordinate production schedules.
Multifunctional hotel lobby furniture helps a hotel accommodate focused work, informal meetings, waiting, dining and socialising without making the lobby feel like a collection of unrelated zones. The right furniture mix combines distinct seating types, clear circulation, convenient access to power, easy maintenance and a coordinated design, allowing the space to serve different needs throughout the day.
Tongda Hospitality supplied 1,846 furniture items for Wyndham Changsha South, covering lobby lounges, restaurants, banqueting, meeting rooms, private dining and leisure areas, with black walnut veneer, PU finishes and selected metal details.
Residential-style hotel furniture brings the warmth and comfort of a private home into luxury hospitality. Learn how to maintain that residential character while meeting the durability, engineering and consistency required for hotel projects.
Hotel conversion projects require more than replacing outdated furniture. Buyers need to reconcile new brand standards with existing building conditions, then decide which furniture should be kept, modified, replaced or custom-made.
Hotel furniture should not be delivered simply because the factory has finished production. The installation area must be sufficiently complete, accessible and protected, with key construction, MEP and coordination requirements resolved before furniture arrives.
Before mass production begins, hotel furniture buyers should confirm that the approved drawings, materials, finishes and construction details can actually be reproduced in production. A proper pre-production inspection is about production readiness, not simply checking another sample.
Using multiple hotel furniture suppliers can work well on an international hotel project, but only when the scope is divided carefully. The important issue is not how many suppliers you appoint, but where the boundaries are drawn and how the interfaces between suppliers are controlled.
Hotel furniture support should not necessarily end when the shipment arrives. This article explains what hotel owners, operators and procurement teams should clarify about warranty, replacement parts, repairs, technical records and future reorders, with examples from Tongda's long-term international hotel projects.
A hotel furniture supplier may be responsible for much more than manufacturing furniture. This article explains which project services should be clarified before an order is placed, including specification review, shop drawings, samples, material coordination, production, quality control, packaging, delivery and site support, with examples from Tongda's international hotel projects.